Flash Back Friday: June 30th 2009 - Day 6 of building R2-TD

Not a good day. I was 2 hours late to build because of a plumbing problem at the house. After fixing that, I ran off and left my camera so no pics tonight!

Moose and I router cut the bottum ring for the frame. It is now done. Clay and I router cut the top ring. The first cut was good and smooth. The second cut, the blade slipped out of the router again and I cut all the way thought the ring and the table!! Dang it! The guys are telling me we can fix it but still not a good build night!!

Brad and I hope to get together sometime this week to start gluing. The goal is to have the legs and frame together and possibly a dome in 2 weeks.